{"id":548,"date":"2014-08-01T21:45:20","date_gmt":"2014-08-01T20:45:20","guid":{"rendered":"http:\/\/www.southmoreton.org.uk\/?p=548"},"modified":"2014-08-01T21:45:58","modified_gmt":"2014-08-01T20:45:58","slug":"fulscot-bridge-update-3","status":"publish","type":"post","link":"http:\/\/www.southmoreton.org.uk\/?p=548","title":{"rendered":"Fulscot Bridge Update"},"content":{"rendered":"<p>Latest update from Network Rail regarding the bridge works:<\/p>\n<p>We continue to make good progress at Fulscot Road. The current status of the works is as follows:<\/p>\n<ul>\n<li>South capping beam completed 25\/7\/14 \u2013 striking formwork and clearing from site<\/li>\n<li>Precast capping beam completion units [SE] poured 29\/7\/14<\/li>\n<li>SW capping beam completion unit completed 30\/7\/14<\/li>\n<li>Kerb installation commenced 30\/7\/14<\/li>\n<li>Vehicle and pedestrian barrier being installed on capping beam and L units \u2013 [north and south]<\/li>\n<li>Drainage and utilities duct installation complete by 8\/8\/14<\/li>\n<li>Surfacing complete by 22\/08\/14<\/li>\n<li>Barrier installation complete by 29\/08\/14<\/li>\n<li>Road Open 2\/9\/14<\/li>\n<\/ul>\n<p>We are still on target for opening the road by early September 2014.<\/p>\n<p><!--more--><\/p>\n<p>Progress Photos:<\/p>\n<p><a href=\"http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge1010814.png\"><img decoding=\"async\" loading=\"lazy\" class=\"size-medium wp-image-549 alignright\" src=\"http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge1010814-300x207.png\" alt=\"Bridge1010814\" width=\"300\" height=\"207\" srcset=\"http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge1010814-300x207.png 300w, http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge1010814-1024x707.png 1024w, http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge1010814.png 1100w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge2010814.png\"><img decoding=\"async\" loading=\"lazy\" class=\"size-medium wp-image-550 alignleft\" src=\"http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge2010814-300x207.png\" alt=\"Bridge2010814\" width=\"300\" height=\"207\" srcset=\"http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge2010814-300x207.png 300w, http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge2010814-1024x707.png 1024w, http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge2010814.png 1101w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge3010814.png\"><img decoding=\"async\" loading=\"lazy\" class=\"alignleft size-medium wp-image-551\" src=\"http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge3010814-300x207.png\" alt=\"Bridge3010814\" width=\"300\" height=\"207\" srcset=\"http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge3010814-300x207.png 300w, http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge3010814-1024x707.png 1024w, http:\/\/www.southmoreton.org.uk\/wp-content\/uploads\/2014\/08\/Bridge3010814.png 1101w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Latest update from Network Rail regarding the bridge works: We continue to make good progress at Fulscot Road. The current status of the works is as follows: South capping beam completed 25\/7\/14 \u2013 striking formwork and clearing from site Precast capping beam completion units [SE] poured 29\/7\/14 SW capping beam completion unit completed 30\/7\/14 Kerb &hellip; <\/p>\n<p class=\"link-more\"><a href=\"http:\/\/www.southmoreton.org.uk\/?p=548\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Fulscot Bridge Update&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":549,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0},"categories":[2],"tags":[],"_links":{"self":[{"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/548"}],"collection":[{"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=548"}],"version-history":[{"count":3,"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/548\/revisions"}],"predecessor-version":[{"id":554,"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/548\/revisions\/554"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=\/wp\/v2\/media\/549"}],"wp:attachment":[{"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=548"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.southmoreton.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}